Akron Childrens Hospital Boardman, Beeghly Emergency Department Addition Started December 2021, Completed May 2023
- Installed new Johns Manville .060 EPDM adhered roofing, insulation and vapor barrier at new low sloped entrance canopies & new low sloped roof areas, (approximately 18,300 SF), all over new and existing metal roof decks.
- Installed new ventilated nail board, insulation and vapor barrier over new Penthouse and Front Entrance Lobby sloped metal decks and installed Owens Corning Oakridge shingles, (approximately 10,150 SF), with ice and water membrane, shingle ridge vent, valley metal, drip edge and Berger stainless steel snow guards.
- Installed new Peterson Aluminum Fascia and Soffit at the new Penthouse building.
- Installed new Knightwall hat channels and new Reynobond 4MMFR Rain Screen, composite panels at the new Emergency front lobby and canopy.
- Installed new EPDM flashing & tie-in to new and existing EPDM roof areas.
- Installed new Johns Manville .060 EPDM flashing and Prestolock copings at the low slope roof parapet walls.